Member is responsible for providing a cleared right-of-way. Overhead Line Extension
Single-Phase: 4.25 per foot *Plus $1300.00 construction fee Three-Phase: $11.50 per foot
30ft Meter Pole: $200 plus tax.
Underground Line Extension
Member is responsible to provide 4ft deep trench. Single-Phase: 8.50 per foot Three-Phase: $15.00 per foot Padmount Transformer Charge Single-Phase: $600 Three-Phase: $3,000
*No underground will be installed between December 1st to April 1st
Overhead to underground conversion fee:
Single-Phase: $800 Three-Phase: $2,400
$300 plus tax for a pole pedestal.
$425 plus tax for a 200A free standing meter pedestal. $775 plus tax for a 400A free standing meter pedestal.
Member is responsible for installing, maintaining and locating secondary conductor from pedestal to house.
Trenching: $200.00 plus $1.50 per foot (where feasible)
Plowing: $400.00 plus $ .50 per foot (where feasible)
Credit
All contribution in aid of construction, other than underground conversion and transformer charges, are refundable at a 3.7¢ per kilowatt hour credit on your monthly bill once the service is connected. This will continue for three years or until contribution is fully refunded, whichever comes first.
Prices subject to change without notice.
|